ADR Conventions (Reference)
Directory
If the repo already has an ADR directory, keep it.
If the repo has no ADR directory, choose based on project size:
docs/decisions/— MADR default, recommended for projects with existingdocs/structure.adr/— simpler alternative for smaller repos.
Detection order (used by scripts): contributing/decisions/, docs/decisions/, adr/, docs/adr/, docs/adrs/, decisions/.
Filename Conventions
Pattern: YYYY-MM-DD-title-with-dashes.md
YYYY-MM-DDis the ADR creation date (matches thedatefrontmatter field).- Title uses lowercase, dashes, present-tense imperative verb phrase.
- Examples:
2025-06-15-choose-database.md,2025-07-01-adopt-adrs.md - Multiple ADRs on the same date are fine — the slug suffix disambiguates them.
If a repo already uses slug-only filenames (no date prefix), follow that convention.
Minimal Sections
At minimum, every ADR must clearly include:
- Context: why the decision exists now, what constraints/drivers apply.
- Decision: what is chosen.
- Consequences: what becomes easier/harder, risks, costs, follow-ups.
For agent-first ADRs, also ensure:
- Constraints are explicit and measurable
- Non-goals are stated
- Follow-up tasks are identified
Status Values
Track status in YAML front matter:
---
status: proposed
date: 2025-06-15
decision-makers: Alice, Bob
---
Common statuses:
| Status | Meaning |
|---|---|
proposed | Under discussion, not yet decided |
accepted | Decision is active and should be followed |
rejected | Considered but explicitly not adopted |
deprecated | Was accepted but no longer applies — explain replacement path |
superseded by [title](link) | Replaced by a newer ADR — always link both ways |
YAML Front Matter Fields
| Field | Required | Description |
|---|---|---|
status | Yes | Current lifecycle state |
date | Yes | Date of last status change (YYYY-MM-DD) |
decision-makers | Yes | People who own the decision |
consulted | No | Subject-matter experts consulted (two-way communication) |
informed | No | Stakeholders kept up-to-date (one-way communication) |
The consulted and informed fields follow the RACI model and are useful for audit trails in larger teams.
Mutability
- Prefer appending new information with a date stamp over rewriting existing content.
- If a decision is replaced, create a new ADR and explicitly supersede the old one.
- Status changes and after-action notes are fine to edit in-place.
Categories (Large Projects)
For repos accumulating many ADRs, use subdirectories:
contributing/decisions/ # or docs/decisions/
backend/
2025-06-15-use-postgres.md
frontend/
2025-06-20-use-react.md
infrastructure/
2025-07-01-use-terraform.md
Date prefixes are local to each category. Choose a categorization scheme early (by architectural layer, by domain, by team) and document it in the index.
Alternative: use tags or a flat structure with a searchable index. Subdirectories are simpler and work with all tools.